East Midlands Airport - 2017

Client: Galliford Try
Contract: East Midlands Airport
Scope of Works: Installation of electrical duct pits, lighting column bases & reinstatement of PQC.

Hinckley Point C - Park & Ride - 2017

Client: EDF Energy
Contract: Hinckley Point C - Park & Ride
Scope of Works: Construction of new 200mm thick reinforced concrete slabs including asscociated slot drainage.

Manchester Airport - 2017

Client: Galliford Try
Contract: Manchester Airport - Taxiway Delta, Juliet & Lima - 2017
Scope of Works: Replacing existing concrete pavement & sub base. New ground drainage & AGL ducting system. 

Bristol Guided Busway - 2017

Client: Balfour Beatty
Contract: Bristol MetroBus Guided Busway - 2017
Scope of Works: CRCP (Continuosly Reinforced Concrete Paving) completed to highway specifications of 250mm of thickness.
Date Completed: 14th April 2017

Heads of Valley - 2016/18

Client: Costain Ltd and Welsh Ministers
Contract: Heads of Valley - 2016/18 
Scope of Works: Slipformed ‘V’ drainage channel & Concrete Barrier installtion.

RAF Valley - 2016

Client: Whitemountain/Northstone
Contract: RAF Valley - 2016
Scope of Works: Installation of 26,075m2 PQC in refurbishment of runway ends.

Edinburgh Airport - 2016

Client: BAM Nuttall
Contract: Edinburgh Airport - 2016 
Scope of Works: New apron at Edingburgh airport. 4,500m2

M5 Junction 22 and 23 - 2016

Client: Skanska
Contract: M5 Junction 22 and 23 - 2016
Scope of Works: Installation of 2000m2 BBS Concrete Barrier

Port of Felixstowe - 2016

Client: Costain Ltd and FDRC
Contract: Port of Felixstowe - Felixstowe Docks
Scope of Works: Installation of 4000 LM Fin Drain, Fabrication and Installation of 110 no. Drainage Chambers, Onsite Concrete Batching and Supply and laying of 135,000 m2 of PQC (Various Depths).

Gatwick Airport - 2016

Client: Vinci Construction UK Ltd
Contract: Gatwick Airport - Pier 1 Apron and Taxiways Reconfiguration
Scope of Works: Installation of WLC and PQC, AGL Ducting, Slot Drains and UKAS Testing

M54 - 2015

Clients: Costain Ltd & AMEY
Contract: M54 - Junction 3 to 4
Scope of Works: Full Depth (280 mm) bay replacements in PQ-X concrete.

M42 - 2014

Clients: Costain Ltd & AMEY
Contract: M42 - Junction 3A to 4
Scope of Works: Full Depth (255 mm) bay replacements in PQ-X concrete.

© All Rights Reserved Gill Civil 2018 | Part of the Gill Group Companies

Menu