Project: Hinkley Point - Park and Ride | Client: Costain Ltd & EDF Energy | Duration: Apr 2017 - Jul 2017 | Supplier: Titan Plant Hire Ltd and Britannia Onsite Concrete Ltd

Scope: Supply and lay of 16,000 m2 of Pavement Quality Concrete and installation of 375m of Slot Drains.

Details:
Gill Civil Engineering (GCEL) worked with Costain Limited to deliver a new park and ride facility connecting M5 J23 to Hinkley Point Power Plant. Works involved placement of mesh, installation of 200mm thick concrete slab with slot drain and 10 access chambers.

GCEL worked with our in-house concrete supplier to set up an on-site transfer station, ensuring that concrete supply was always met. The project was a success and completed within the required timescale.

Project Completion Date: 10/07/2017