Gill Civil Engineering Limited (GCEL) was appointed by Galliford Try to undertake the rehabilitation of Taxiway Juliet at Manchester Airport. Due to the close proximity to the main runway (05L–23R), the work had to be carried out during short nighttime working windows in an airside environment, and excavated areas had to be de-lethalised every night.
Manchester Airport Taxiway Juliet
