Heads of the Valley A465 (V-Channel)

HoV-V-channel-case-study

GCEL were appointed to slip-form 8,500 m of surface water channel of varying width (800 mm and 1,000 mm) on central reserve and on verge at A465 Heads of Valley Section 2 project. The work comprises slip forming V channel and gullies with the inclusion of wet formed contraction and expansion joints at regular interval.