M42

M42-Case-Study

GCEL were appointed to carry out 1310 m2 of full depth concrete repair on both carriageways of the M42 between junctions 3A-4. The scope of work included removal of existing dowelled concrete bays and reinstating using PQX (Rapid Strength Gain Concrete) overnight.