GCEL were appointed to carry out 2862 m2 of full depth concrete repair on both carriageways of the M54 between junction 3 to 5. The scope of work includes the removal of existing dowelled concrete bays and reinstating using PQX (Rapid Strength Gain Concrete) overnight.
M54
