Gill Civil Engineering began the rehabilitation of taxiway Alpha Echo at Manchester Airport in February 2018.
The scope of works at Manchester Airport includes:
- Installation of 730mm thick type FH dry lean concrete including 2 no. AGL duct crossing.
- The total area of installation is 7700m2.
- All concrete is installed and tested in accordance with DIO specification 051.
- All work on day shifts is carried out in an airside working environment.