Shafqat Malik, Project Engineer, United States Army Corps of Engineers Oman Resident Office, providing feedback for GRM Slipform Paving

Your outstanding performance has significantly contributed to the latest successful milestone. The management, and the United States Army Corps of Engineers would like to extend its appreciation, and commends your efforts and the professional manner in which you performed your duties.

Shafqat Malik, Project Engineer, United States Army Corps of Engineers Oman Resident Office, providing feedback for GRM Slipform Paving
E. P. Murray, Director at Huyton Asphalts Limited, providing feedback for Gill Civil Engineering Limited and Titan Plant Hire Limited.

This particular contract worked very well for both our companies. I would have no hesitation in working with Gill again if the occasion arises.

E. P. Murray, Director at Huyton Asphalts Limited, providing feedback for Gill Civil Engineering Limited and Titan Plant Hire Limited.
Sean Flaherty, Site Agent, Thomas Vale Construction Limited, providing feedback for Gill Civil Engineering Limited and Titan Plant Hire Limited.

Thomas Vale takes its approach to Health, Safety and Welfare extremely seriously - which is why it is of paramount importance that our supply chain partners consider it to be as equally important. Their approach is second to none in achieving the stringently high levels that we set and their performance to date is a testament to their own business credentials, processes, procedures and top-down commitment.

Sean Flaherty, Site Agent, Thomas Vale Construction Limited, providing feedback for Gill Civil Engineering Limited and Titan Plant Hire Limited.
Andrew Hall, Contracts Manager, Bullock Construction, providing feedback for Gill Civil Engineering Limited and Titan Plant Hire Limited.

The tight layout of the site and the fast track programme required some careful planning. They selected a suitable team of workers and the right equipment to carry out the job. They provided the best solution to improve the speed of construction and limit disruption. The management of the site ensured that production never faltered

Andrew Hall, Contracts Manager, Bullock Construction, providing feedback for Gill Civil Engineering Limited and Titan Plant Hire Limited.
Trevor Staley, Project Manager, Costain, providing feedback for Gill Civil Engineering Limited and Titan Plant Hire Limited.

Gill performed professionally throughout. Attention to detail excellent. Good safety culture.

Trevor Staley, Project Manager, Costain, providing feedback for Gill Civil Engineering Limited and Titan Plant Hire Limited.
Darren McDermott, Senior Quantity Surveyor, Balfour Beatty, providing feedback for Gill Civil Engineering Limited.

Gill Civil Engineering were procured as a key specialist contractor on the Bristol Guided Busway by Balfour Beatty.

Aided by Gill’s prompt involvement, the design was developed for the Continuously Reinforced Concrete Pavement (CRCP) Guided Busway and Gill reacted well to change and design development. Their can-do approach was well received and all parties involved contributed to the successful completion of a pioneering Guided Busway.

Balfour Beatty would have no hesitation to recommend Gill Civil Engineering for any CRCP pavement works. 

Darren McDermott, Senior Quantity Surveyor, Balfour Beatty, providing feedback for Gill Civil Engineering Limited.
Dean Courtney-Ward, Technical Sales Manager, Britpave Barrier Systems, providing feedback for Gill Civil Engineering Limited.
  • Quality Management – BBS were very pleased with the effort and commitment shown by the Gill team in the run up to, and during, the assessment from our Notified Body Horiba MIRA. The audit was completed at the first time of asking with no concerns.

  • Trial Installation – BBS noted that the quality of CSB produced was of the highest standard with particular reference to dimensional stability and appearance. It was also noted the installation team were highly trained and competent at their respective tasks.

  • Overall pre-qualification – Gill Civil obtained their Provisional Licence within 7 months, this was well within the typical timeframe of 12-18 months.

Gill Civil exceeded the expectations of BBS in terms of demonstrating a level of competence and quality within a short period of time. We expect that this was carried over from a wealth of experience within the slipforming industry over many years globally. It was reassuring that Gill Civil adopted to the BBS requirements and specifications without issue and we were delighted to welcome the company as a Licensed Installer.

Dean Courtney-Ward, Technical Sales Manager, Britpave Barrier Systems, providing feedback for Gill Civil Engineering Limited.
Dai Jones, Commercial Manager, Costain Limited, providing feedback for Gill Civil Engineering

Costain engaged Gill as our key subcontractor on the project to replace the defective paving at Felixstowe South Reconfiguration Phase 1 with PQC.  The importance of Gill is emphasised by the fact that it accounted for approximately 50% of the value of the repair contract.

Throughout the project, Gill provided Costain with excellent service and were motivated and co-operative.  Gill also paid high regard to safety, which was particularly important in a busy, “live” Port environment with a high risk from vehicular traffic and moving cranes.  Gill’s staff and operatives were an integral part of the project team and were a pleasure to work with.

The project was completed 6 months ahead of the original programme and within the original budget and Gill’s contribution is recognised and highly valued by Costain.

Dai Jones, Commercial Manager, Costain Limited, providing feedback for Gill Civil Engineering
Mick Neeson, Works Manager, Skanska Infrastructure Services, Providing feedback for Gill Civil Engineering Limited, Titan Plant Hire Limited and Britannia Onsite Concrete Limited.

Gill Civil Engineering recently worked alongside Skanska M25 Pavement Renewals team and during this time they have carried out their duties both diligently and safely. They have a positive and innovated approach and go that extra mile to promote safe working for both their operatives and the wider site team. Their in-house capability to provide specialist plant through Titan Plant Hire and on-site concrete using Britannia Onsite Concrete ensured a smooth operation on site when working in a small confined environment with limited working windows.

I have no hesitation in providing a referral.

Mick Neeson, Works Manager, Skanska Infrastructure Services, Providing feedback for Gill Civil Engineering Limited, Titan Plant Hire Limited and Britannia Onsite Concrete Limited.
David Neal, Managing Director, Connect Plus Services, Providing feedback for Gill Civil Engineering Limited

I am just writing this short message to thank Gill Civil Engineering and their team for the level of input and collaboration that was demonstrated during the recent repairs to the damaged ECP on the M25. I know that it was a relatively complicated job given the restrictions on us and the fact that it was the transition between the CSB and the ECP.

With the support of Gill Civil Engineering and other fellow suppliers, we were able to complete these works successfully in particularly difficult times and I am really grateful for their dedication and assistance.

David Neal, Managing Director, Connect Plus Services, Providing feedback for Gill Civil Engineering Limited

© All Rights Reserved Gill Civil 2018 | Part of the Gill Group Companies

Menu