Gill Civil constructed a new taxiway link at Gatwick Airport, delivering high-performance pavement and drainage works within a live airside environment while maintaining uninterrupted operations and meeting programme deadlines.
Gill Civil was appointed by Interserve to construct a new taxiway link connecting the Boeing hangar apron to Taxiway Uniform at Gatwick Airport. The works included installation of 6,120m² of 415mm Pavement Quality Concrete (PQC) and 150mm Wet Lean Concrete (WLC), alongside 1,500m² of 225mm PQC and 150mm WLC. The scope also incorporated installation of 150m of 600mm slot drainage with associated access and outlet boxes, forming a key connection within the airfield infrastructure.
Delivered within a live airside environment on day shifts, the project required careful planning to manage winter paving conditions, coordination with multiple contractors, and integration around existing structures. Detailed sequencing and close stakeholder coordination ensured works progressed efficiently while maintaining safety and operational continuity. Strict programme control enabled the team to meet key milestones ahead of the Christmas deadline, while maintaining quality and budget compliance.
Leveraging extensive Gatwick experience, Gill Civil delivered the taxiway connection safely and efficiently, maintaining uninterrupted airport operations throughout the works. The completed pavement provides a durable, high-performance solution, enhancing connectivity and supporting long-term airfield performance.
Gill Civil constructed a 12,500m² aircraft apron at Gatwick Airport, completing the works ahead of schedule while delivering a high-strength, durable surface for long-term operations.
Gill Civil delivered a complex taxiway replacement at Gatwick Airport, protecting live services while enhancing long-term pavement durability within a live airside environment.