A11

Gill Civil delivered replacement of 32 concrete bays on the A11 between Red Lodge and Barton Mills, using high early-strength PQX concrete during overnight closures to extend pavement life beyond 15 years.

A30

Gill Civil delivered full-depth replacement of 25 deteriorated concrete bays on the A30 Long Rock Bypass, using high early-strength concrete during night closures to extend pavement life and minimise disruption.

A556

Gill Civil delivered a 900mm-thick reinforced concrete protection slab over live fuel pipelines on the A556, providing a cost-effective alternative to diversion while maintaining full infrastructure protection and avoiding service disruption.

M5 Motorway

Gill Civil delivered approximately 4,000m² of full-depth concrete bay replacement on the M5 near Junction 27 at Willand, extending pavement life while maintaining programme delivery within a live motorway environment.

M25 Motorway

Gill Civil delivered drainage improvement works on the M25 between Junctions 22 and 23, upgrading existing gully infrastructure to increase surface water capacity and enhance motorway resilience during heavy rainfall.

Surrey County Council

Gill Civil delivered a programme of full-depth concrete road reinstatement works across Surrey, reconstructing carriageways to modern highway standards using high-durability concrete, enhanced reinforcement, and upgraded drainage to extend asset life while minimising disruption to road users and local communities.

A55

Gill Civil completed full-depth pavement replacements and crack repairs on the A55 between Junctions 34-35 within a single weekend possession, delivering 31 bay renewals using rapid-strength concrete and efficient sequencing to reopen the carriageway ahead of schedule and restore long-term performance with minimal disruption.

M54 Motorway

GCEL were appointed to carry out 2862m2 of full depth concrete repair on both carriageways of the M54 between junction 3 to 5. The scope of work includes the removal of existing dowelled concrete bays and reinstating using PQX (Rapid Strength Gain Concrete) overnight.

A417/419 CIRENCESTER

Gill Civil Engineering Ltd (GCEL) were contacted by Ringway/RMS in 2015 to be their preferred partner in carrying out CRCP repairs on the A417/419 in Cirencester. In line with the commitment, the repairs are to be identified and repair works carried out by GCEL in spring and autumn time every year, in addition to short […]

Bristol Guided Busway

Gill Civil Engineering (GCEL) were responsible for the installation of a Continuously Reinforced Concrete Pavement designed for the guided busway which improved transport infrastructure in Bristol.