Gill Civil delivered 6,500m² of high-precision CRCP for a Bristol guided busway, completing the works on programme despite challenging conditions to ensure durable, long-term performance.
Gill Civil delivered 6,500m² of Continuously Reinforced Concrete Pavement (CRCP) and installed 64 ground beam anchors as part of a 1.2-mile guided busway between Long Ashton and Ashton Avenue Bridge, Bristol. The scheme formed a key element of the wider transport infrastructure, designed to improve connectivity and provide a reliable, high-capacity public transport route.
The guided busway system required construction within very tight tolerances to ensure precise alignment, correct levels, and safe vehicle tracking. Works were undertaken during winter under challenging weather and logistical conditions, requiring careful sequencing and consistent quality control. Close coordination with Balfour Beatty and the concrete supply chain ensured materials, plant, and programme requirements were aligned, enabling efficient delivery while maintaining the required construction accuracy.
The project significantly enhanced local transport infrastructure, delivering a high-precision, durable CRCP solution capable of supporting long-term operational demands. Despite seasonal and logistical challenges, the works were completed on programme, providing a resilient and low-maintenance pavement that ensures safe, smooth, and reliable guided bus operations.
Gill Civil delivered infrastructure and public realm works for the Dukesfield Active Transport Link, improving pedestrian and cycling connectivity around Runcorn Railway Station while maintaining safe access through a constrained urban environment.
Gill Civil delivered AGL pavement core stabilisation works across MAG airports, using rapid-strength concrete and controlled on-site mixing to return critical aircraft wheel-path areas to service within restricted operational windows.
Gill Civil delivered time-critical pavement and drainage upgrades at Newquay Airport for the G7 Summit, working around the clock through COVID-19 supply disruption to maintain programme certainty in a live airside environment.