Gill Civil delivered AGL pavement core stabilisation works across MAG airports, using rapid-strength concrete and controlled on-site mixing to return critical aircraft wheel-path areas to service within restricted operational windows.
Gill Civil Engineering was appointed by MAG to stabilise and reinstate existing AGL pavement cores across its airport network, including critical aircraft wheel paths. Existing cores were over-cut, removed and reinstated with high early-strength concrete, achieving the required cure within approximately 90 minutes for safe return to aircraft trafficking. Each location was then re-cored to allow installation of new AGL fittings. The works required a rapid, durable and carefully controlled solution to minimise operational disruption while maintaining airfield safety and programme certainty.
Operational constraints required a bespoke approach using pre-weighed, bagged materials prepared landside and transported airside for controlled pan-mixer batching, ensuring consistent mix quality. High early-strength concrete enabled curing within approximately 90 minutes, allowing up to six cores to be extracted, reinstated and cured within restricted six-hour working windows. Winter conditions and harsh open-airfield weather required careful control of mixing, placement and curing. Specialist equipment, pre-measured materials and detailed planning supported accurate finishing, with all works coordinated around live operations, permits and airside safety requirements.
The project was delivered on schedule, with all reinstated cores achieving the required early strength and durability for demanding aircraft wheel path conditions. Pre-batched materials and controlled on-site mixing maintained consistent concrete performance despite challenging weather, allowing operational areas to reopen rapidly without disrupting flight schedules. Gill Civil’s technical oversight ensured specification compliance throughout, providing a durable, fit-for-purpose solution for ongoing AGL realignment and upgrade works across Manchester Airport and East Midlands Airport.
Gill Civil delivered infrastructure and public realm works for the Dukesfield Active Transport Link, improving pedestrian and cycling connectivity around Runcorn Railway Station while maintaining safe access through a constrained urban environment.
Gill Civil delivered time-critical pavement and drainage upgrades at Newquay Airport for the G7 Summit, working around the clock through COVID-19 supply disruption to maintain programme certainty in a live airside environment.
Gill Civil delivered full-depth replacement of 25 deteriorated concrete bays on the A30 Long Rock Bypass, using high early-strength concrete during night closures to extend pavement life and minimise disruption. A30 Long Rock Bypass