Gill Civil delivered full-depth concrete road reinstatement across Surrey, enhancing durability and modernising the network while maintaining safe, efficient delivery with minimal disruption.
Gill Civil has delivered full-depth concrete road reinstatement across Surrey, reconstructing carriageways to modern standards using high-durability concrete, enhanced reinforcement, and upgraded drainage and footways. Delivered under strict safety and quality controls, including UKAS testing, the works have extended asset life and modernised the highway networing. Following an initial pilot scheme, Gill Civil has developed an ongoing relationship with Surrey County Council, providing continued support across its pavement asset management programme.
Works were delivered through a planned reinstatement approach, with traffic management and stakeholder coordination arranged in advance to minimise disruption. Existing concrete was removed in a controlled manner to prevent damage to any underground services. Specialist mixes, precision equipment, and efficient sequencing enabled timely reopening within restricted hours while maintaining access. All schemes were completed on programme, delivering durable, high-quality carriageways in line with safety and environmental standards.
Careful planning, specialist techniques, and proactive stakeholder engagement enabled safe, efficient reinstatement with minimal disruption to residents, businesses and emergency services. Specialist mixes and coordinated delivery ensured durable, high-quality highways and timely reopening. Since a 2022 pilot scheme, our role has expanded within Surrey County Council’s pavement asset management programme, supporting ongoing planning and asset life extension. Our performance has been widely recognised, including nomination for a 2026 Gold Award for outstanding safety and quality.
Gill Civil delivered infrastructure and public realm works for the Dukesfield Active Transport Link, improving pedestrian and cycling connectivity around Runcorn Railway Station while maintaining safe access through a constrained urban environment.
Gill Civil delivered AGL pavement core stabilisation works across MAG airports, using rapid-strength concrete and controlled on-site mixing to return critical aircraft wheel-path areas to service within restricted operational windows.
Gill Civil delivered time-critical pavement and drainage upgrades at Newquay Airport for the G7 Summit, working around the clock through COVID-19 supply disruption to maintain programme certainty in a live airside environment.
Simply complete the form and one of our specialists will get back to you as soon as possible to provide the support you need.
Fill in the form below with your details and queries. A member of our team will reach out to you as soon as possible to discuss your inquiry.