Gill Civil delivered drainage upgrades on the M25, installing higher-capacity gully systems within restricted night works to improve resilience and reduce flood risk.
Gill Civil delivered drainage improvement works on the M25 between Junction 23 and Junction 22 in the Catherine Bourne area. The project focused on increasing drainage outlet capacity by upgrading existing gully infrastructure. At each selected location, the existing single gully arrangement was replaced with a triple gully system, significantly increasing the capacity of surface water drainage. In total, 10 locations were upgraded along this section of the motorway.
All works were carried out during restricted night-time closures to minimise disruption to motorway users. Operational working hours were limited to a four-hour window from Monday to Friday nights, with the carriageway safely reopened to traffic each morning. The project required careful planning to manage potential risks including adverse weather conditions, complex existing infrastructure, buried utilities, and other adjacent highway assets. Detailed coordination and efficient sequencing ensured all activities were completed within the limited working windows.
Despite the operational constraints, the works were delivered safely and within budget. The upgraded triple gullies drainage systems significantly improved the surface water capacity of the carriageway, enhancing resilience during heavy rainfall and reducing the risk of water accumulation. The scheme was successfully completed ahead of schedule and within the agreed budget while maintaining safe and reliable motorway operations throughout the project.
Gill Civil delivered infrastructure and public realm works for the Dukesfield Active Transport Link, improving pedestrian and cycling connectivity around Runcorn Railway Station while maintaining safe access through a constrained urban environment.
Gill Civil delivered AGL pavement core stabilisation works across MAG airports, using rapid-strength concrete and controlled on-site mixing to return critical aircraft wheel-path areas to service within restricted operational windows.
Gill Civil delivered time-critical pavement and drainage upgrades at Newquay Airport for the G7 Summit, working around the clock through COVID-19 supply disruption to maintain programme certainty in a live airside environment.