Gill Civil delivered infrastructure and public realm works for the Dukesfield Active Transport Link, improving pedestrian and cycling connectivity around Runcorn Railway Station while maintaining safe access through a constrained urban environment.
Gill Civil reinstated defective concrete slabs at Birmingham Airport using rapid-strength concrete, enabling safe, on-programme delivery and quick return to service within a live airside environment.
Gill Civil delivered drainage upgrades on the M25, installing higher-capacity gully systems within restricted night works to improve resilience and reduce flood risk.
Gill Civil delivered approximately 55,000m² of PQC and over 1,000lm of drainage across key airside areas at Farnborough Airport, completing the works two months ahead of schedule while maintaining live operations.