(MAN) TAXIWAY ZULU
Gill Civil delivered airside pavement and drainage works on Taxiway Zulu at Manchester Airport, safely and on schedule, enhancing durability and performance.
(MAN) P2P2
Gill Civil delivered landside pavement and drainage infrastructure for Pier 2 at Manchester Airport, safely and on programme within a live environment, enhancing long-term performance and operational efficiency.
(MAN) PP04 AIRSIDE
Gill Civil delivered major airside ducting, drainage, and high-strength pavement works at Manchester Airport within live night operations, ensuring safe delivery and long-term airfield performance.
(MAN) PP03 MANTP
Gill Civil delivered large-scale PQC, lean mix, drainage, and ducting works as part of the Manchester Airport Transformation Project, completing the scheme safely and on programme within a live 24-hour airside environment while enhancing apron capacity and long-term performance.