Gill Civil Engineering (GCEL) were responsible for the installation of a Continuously Reinforced Concrete Pavement designed for the guided busway, which improved transport infrastructure in Bristol. GCEL acted as a specialist contractor, constructing a total of 1.2 miles of guided busway from Long Ashton to Ashton Avenue Bridge.
Bristol Guided Busway
