Gill Civil has been delivering airside and landside infrastructure at Manchester Airport for over 20 years, completing multiple pavement, drainage, and concrete works projects. Our long-standing presence reflects our ability to deliver safely, efficiently, and in line with the operational demands of one of the UK’s busiest airports.
Gill Civil was appointed to deliver a major taxiway reconstruction at one of the world’s busiest airports. The project required precision scheduling and coordination to ensure minimal disruption to daily operations.
Gill Civil was appointed to deliver a major taxiway reconstruction at one of the world’s busiest airports. The project required precision scheduling and coordination to ensure minimal disruption to daily operations.
Gill Civil delivered AGL pavement core stabilisation works across MAG airports, using rapid-strength concrete and controlled on-site mixing to return critical aircraft wheel-path areas to service within restricted operational windows.
Gill Civil delivered approximately 55,000m² of PQC and over 1,000lm of drainage across key airside areas at Farnborough Airport, completing the works two months ahead of schedule while maintaining live operations.
Eleven sections of defective concrete slabs at Birmingham International Airport were reinstated within live Code C stands using high early-strength concrete (Peragrene) to enable rapid replacement and early return to service.
Gill Civil delivered two new remote aircraft stands at Leeds Bradford Airport, including taxiway tie-ins, PQC pavement, drainage and AGL ducting, increasing stand capacity while maintaining uninterrupted live-airfield operations.
Gill Civil delivered time-critical pavement and drainage upgrades at Newquay Airport for the G7 Summit, working around the clock through COVID-19 supply disruption to maintain programme certainty in a live airside environment.
Gill Civil constructed a 4,500m² aircraft stand at Edinburgh Airport, delivering high-strength pavement and drainage on programme within a live winter airside environment.
Gill Civil delivered major airfield pavement works at RAF Valley, installing over 26,000m² of high-performance PQC and supporting infrastructure during a four-week shutdown, using an on-site batching plant to ensure continuous supply and successful delivery within the restricted programme.
Gill Civil is delivering 5,240m² of reinforced C40/50 concrete pavement at Walney Airfield in Barrow-in-Furness, carefully coordinated around live airfield operations to provide a durable, high-quality surface for new aviation infrastructure.