Gill Civil reinstated defective concrete slabs at Birmingham Airport using rapid-strength concrete, enabling safe, on-programme delivery and quick return to service within a live airside environment.
Eleven sections of defective concrete slabs at Birmingham International Airport were reinstated within live Code C stands using high early-strength concrete (Peragrene) to enable rapid replacement and early return to service. Works included saw cutting and coring, breakout and reinstatement of 150mm and 360mm concrete bays with A393 mesh reinforcement, brushed finishes, sawn contraction and isolation joints, and UKAS concrete testing to ensure quality and compliance.
Works were delivered during restricted night-time access within live airside environments, requiring strict safety compliance, FOD control, and close coordination with airport operations. High early-strength concrete (Peragrene) enabled rapid curing within tight possession windows, including during sub-zero conditions. Wide bay pours were completed using multiple concrete deliveries to maintain workability, while repeatable sequencing and specialist airside equipment ensured consistent quality and on-time handback across multiple locations.
The project was delivered on programme within a live airside environment, using rapid-strength, high-performance concrete to minimise disruption to aircraft movements. Specialist planning, equipment, and cold-weather measures ensured safe delivery, long-term durability, and reduced operational risk.
Gill Civil delivered infrastructure and public realm works for the Dukesfield Active Transport Link, improving pedestrian and cycling connectivity around Runcorn Railway Station while maintaining safe access through a constrained urban environment.
Gill Civil delivered AGL pavement core stabilisation works across MAG airports, using rapid-strength concrete and controlled on-site mixing to return critical aircraft wheel-path areas to service within restricted operational windows.
Gill Civil delivered time-critical pavement and drainage upgrades at Newquay Airport for the G7 Summit, working around the clock through COVID-19 supply disruption to maintain programme certainty in a live airside environment.