Gill Civil delivered a 900mm-thick reinforced concrete protection slab over live fuel pipelines on the A556, providing a cost-effective alternative to diversion while maintaining full infrastructure protection and avoiding service disruption.
Gill Civil delivered a reinforced concrete fuel pipe protection slab as part of the A556 works, developing a cost-effective alternative to diverting live fuel pipelines crossing the scheme. The solution involved construction of a heavily reinforced slab directly above the pipeline corridor, reducing design complexity and programme duration while maintaining full infrastructure protection. Works included installation of 150mm concrete blinding, proprietary formwork, and a 900mm thick RC30/37 reinforced concrete slab using pumped concrete placement, alongside induction saw cutting and formation of expansion joints.
Works were undertaken above live fuel pipelines, requiring strict controls while constructing a heavily reinforced 900mm-deep slab. Restricted access and dense reinforcement required carefully planned pumped concrete placement, controlled layering, and systematic vibration to ensure full compaction. Continuous pours eliminated cold joints, supported by coordinated batching and pump delivery, while proprietary formwork maintained stability under high concrete pressure. Enhanced curing and thermal controls were also implemented during hot weather to mitigate thermal cracking.
The protection slab solution provided a cost-effective alternative to pipeline diversion, reducing design complexity and programme duration while maintaining full protection of critical fuel infrastructure. Successful delivery of the reinforced slab ensured structural integrity, durability, and consistent quality, with no service disruption or defects, demonstrating safe and efficient delivery within a constrained environment.
Gill Civil delivered infrastructure and public realm works for the Dukesfield Active Transport Link, improving pedestrian and cycling connectivity around Runcorn Railway Station while maintaining safe access through a constrained urban environment.
Gill Civil delivered AGL pavement core stabilisation works across MAG airports, using rapid-strength concrete and controlled on-site mixing to return critical aircraft wheel-path areas to service within restricted operational windows.
Gill Civil delivered time-critical pavement and drainage upgrades at Newquay Airport for the G7 Summit, working around the clock through COVID-19 supply disruption to maintain programme certainty in a live airside environment.