Gill Civil delivered 22,500m² of reinforced concrete yard slabs for the DHL hub in Slough, ensuring durable, high-performance infrastructure through efficient coordination in a complex winter build.
Gill Civil was appointed to deliver the reinforced external concrete yard slabs for the DHL Distribution Hub at Horton Road, Slough. The works comprised the installation of 22,500m² of 190mm thick C32/40 air-entrained concrete, reinforced with C385 mesh, alongside concrete testing, joint sealing with fuel-resistant sealant, and pours to Gatic slot drainage. The slab design incorporated longitudinal, expansion, contraction, and isolation joints, with dowelled connections to ensure effective load transfer and long-term structural performance.
The project was delivered during the winter months, presenting challenging conditions for concrete placement and curing. The site was logistically complex, with multiple contractors operating within constrained working areas and evolving construction sequences. Gill Civil maintained close coordination with BGCL and the wider project team to ensure timely access to work areas and adherence to programme requirements. Collaboration with the concrete supplier and subcontractors ensured consistent quality and supply, while flexible working hours and adaptive planning allowed works to progress efficiently despite changing site conditions and technical requirements.
The works were successfully completed in line with programme milestones, delivering a durable, high-performance concrete yard capable of supporting heavy-duty logistics operations. The robust jointing and drainage systems enhance long-term performance, while effective planning and coordination ensured high quality standards were maintained throughout in a challenging, multi-contractor environment.
Gill Civil delivered infrastructure and public realm works for the Dukesfield Active Transport Link, improving pedestrian and cycling connectivity around Runcorn Railway Station while maintaining safe access through a constrained urban environment.
Gill Civil delivered AGL pavement core stabilisation works across MAG airports, using rapid-strength concrete and controlled on-site mixing to return critical aircraft wheel-path areas to service within restricted operational windows.
Gill Civil delivered time-critical pavement and drainage upgrades at Newquay Airport for the G7 Summit, working around the clock through COVID-19 supply disruption to maintain programme certainty in a live airside environment.