Project Overview and Scope
Gill Civil was appointed by Amalgamated Construction Limited to deliver landside pavement and infrastructure works for Pier 2 Phase 2 at Manchester Airport (May 2024 – April 2025). The package included installation of 175mm Wet Lean Concrete (WLC) and up to 350mm Pavement Quality Concrete (PQC) pavements, reinforced oncrete slabs, slot drainage and associated pipework, as well as access and outlet chambers. Works were supported by on-site batching facilities and UKAS-accredited concrete testing to ensure consistent quality and compliance.
Challenges and Execution
Working within a live airport environment required strict safety compliance, detailed stakeholder coordination, and careful sequencing alongside multiple contractors and ongoing operations. The scale of concrete volumes and the requirement for high-performance finishes demanded precise logistics, robust quality control procedures, and continuous monitoring. Effective planning, on-site production capability, and close collaboration with the wider project team ensured programme requirements were maintained while minimising disruption.
Benefits and Outcomes
The project was delivered safely and on programme, providing durable,
high-quality pavements and drainage infrastructure that enhance access,
circulation, and operational efficiency around the terminal. The completed works support long-term performance and demonstrate Gill Civil’s capability to deliver complex infrastructure projects within live airport environments.
OTHER PROJECTS
Partner with gill civil on your next project
Simply complete the form and one of our specialists will get back to you as soon as possible to provide the support you need.
Plan your Route
Enquire Now
Fill in the form below with your details and queries. A member of our team will reach out to you as soon as possible to discuss your inquiry.