Gill Civil delivered reinforced concrete pavement reconstruction at Birmingham Intermodal Freight Terminal, installing 390mm heavily reinforced slabs in phased works to improve load capacity while maintaining continuous access for live freight operations.
Gill Civil delivered reinforced concrete pavement reconstruction works within the operational bays at the Birmingham International Freight Terminal for Maritime Transport Ltd, on behalf of Buckingham Group Contracting. The scheme involved strengthening and upgrading the existing pavement to support ongoing heavy-duty freight and logistics operations within a live port environment. Works included breakout and removal of the existing pavement, installation of heavy reinforcement and dowel connections, and construction of new 390mm thick reinforced concrete slabs with a rough power-floated finish. To minimise disruption and maintain operations, the works were phased and delivered in two stages, ensuring continuous access across the terminal bays.
Works were delivered within a live operational freight facility, requiring careful planning and coordination to minimise disruption to terminal activities. Achieving effective integration with the existing slabs required precise dowel installation and surface preparation. The heavily reinforced 390mm slab design, incorporating four layers of A393 mesh alongside cut & bent reinforcement, created congestion during placement and compaction, requiring strict quality control and specialist drilling equipment. The works were successfully completed within the required timeframe.
The project successfully strengthened and upgraded the operational slab areas, improving load-bearing capacity and long-term performance within the freight terminal. Specialist equipment, including EZ Drill systems, concrete pumps, power floats, and compaction tools, enabled efficient delivery, high-quality finishing, and full compliance with project specifications.
Gill Civil delivered infrastructure and public realm works for the Dukesfield Active Transport Link, improving pedestrian and cycling connectivity around Runcorn Railway Station while maintaining safe access through a constrained urban environment.
Gill Civil delivered AGL pavement core stabilisation works across MAG airports, using rapid-strength concrete and controlled on-site mixing to return critical aircraft wheel-path areas to service within restricted operational windows.
Gill Civil delivered time-critical pavement and drainage upgrades at Newquay Airport for the G7 Summit, working around the clock through COVID-19 supply disruption to maintain programme certainty in a live airside environment.