Gill Civil delivered over 220,000m² of high-strength CRCP for dock and RoRo infrastructure, ensuring durable, large-scale performance through efficient on-site production and coordinated delivery.
Gill Civil, in partnership with John Graham Construction, delivered over 220,000m² of Continuously Reinforced Concrete Pavement (CRCP) for major dock and RoRo terminal infrastructure. The works included construction of 175mm, 200mm, and 250mm thick concrete slabs (C40/50 and C50), reinforced with bespoke mesh and incorporating specialist joint detailing. The scope also included installation of over 160 chambers and manholes, forming a high-performance pavement designed for heavy-duty port operations.
Significant daily output targets required the establishment of on-site batching plants producing up to 400m³ of concrete per day, supported by UKAS-accredited testing in partnership with PACT. Custom formwork ensured CRCP reinforcement continuity, while efficient sequencing and coordination managed logistics, weather conditions, and a complex multicontractor environment across a large working area.
The project was delivered safely and efficiently, providing a durable, high strength pavement capable of supporting intensive operational demands. Strong planning, in-house production, and quality control ensured consistent performance, demonstrating Gill Civil’s capability to deliver large-scale, complex infrastructure to high standards of safety, quality, and programme control.
Gill Civil delivered infrastructure and public realm works for the Dukesfield Active Transport Link, improving pedestrian and cycling connectivity around Runcorn Railway Station while maintaining safe access through a constrained urban environment.
Gill Civil delivered AGL pavement core stabilisation works across MAG airports, using rapid-strength concrete and controlled on-site mixing to return critical aircraft wheel-path areas to service within restricted operational windows.
Gill Civil delivered time-critical pavement and drainage upgrades at Newquay Airport for the G7 Summit, working around the clock through COVID-19 supply disruption to maintain programme certainty in a live airside environment.
Simply complete the form and one of our specialists will get back to you as soon as possible to provide the support you need.
Fill in the form below with your details and queries. A member of our team will reach out to you as soon as possible to discuss your inquiry.