Gill Civil delivered over 135,000m² of pavement rehabilitation at Felixstowe Port, completing the works six months early while enhancing durability within a live operational environment.
Gill Civil was appointed to undertake the rehabilitation and replacement of over 135,000m² of defective paving at Felixstowe Port. The works formed a key part of the port’s infrastructure upgrade, requiring the delivery of high-performance pavement solutions within a busy operational environment. The scope included repair and sealing of existing CBGM, installation of fin drains and drainage chambers, construction of gantry reefer foundations, installation of reinforcement and dowelled joints, and the supply and placement of PQC concrete of varying depths and colours using an on-site batching plant.
Gill Civil was appointed to undertake the rehabilitation and replacement of over 135,000m² of defective paving at Felixstowe Port. The works formed a key part of the port’s infrastructure upgrade, requiring the delivery of high-performance pavement solutions within a busy operational environment. The scope included repair and sealing of existing CBGM, installation of fin drains and drainage chambers, construction of gantry reefer foundations, installation of reinforcement and dowelled joints, and the supply and placement of PQC concrete of varying depths and colours using an on-site batching plant.
The scheme was completed successfully and six months ahead of the original programme, demonstrating efficient delivery and strong project management. The works significantly improved pavement performance and durability across the port, supporting ongoing heavy-duty operations. Gill Civil’s contribution was highly valued and recognised by the client, Costain Ltd, highlighting the team’s ability to deliver complex infrastructure projects safely, efficiently, and to a high standard.
Gill Civil delivered infrastructure and public realm works for the Dukesfield Active Transport Link, improving pedestrian and cycling connectivity around Runcorn Railway Station while maintaining safe access through a constrained urban environment.
Gill Civil delivered AGL pavement core stabilisation works across MAG airports, using rapid-strength concrete and controlled on-site mixing to return critical aircraft wheel-path areas to service within restricted operational windows.
Gill Civil delivered time-critical pavement and drainage upgrades at Newquay Airport for the G7 Summit, working around the clock through COVID-19 supply disruption to maintain programme certainty in a live airside environment.