Gill Civil delivered 16,000m² of reinforced concrete pavement and drainage for the M5 Junction 23 Park & Ride, ensuring durable infrastructure through efficient on-site batching and coordinated delivery.
Gill Civil delivered 16,000m² of pavement quality concrete (PQC) and installed 375m of slot drainage for the new Park & Ride facility at M5 Junction 23, supporting the Hinkley Point Power Plant. The scheme formed a key element of the wider infrastructure required to facilitate transport and access to the site. Works included placement of reinforcement mesh, construction of a 200mm concrete slab, installation of slot drainage systems, and construction of 10 access chambers, all designed to provide a durable, high-performance pavement suitable for long-term operational use.
Working in collaboration with Costain, Gill Civil implemented an on-site batching operation using volumetric trucks through its in-house supplier, Britannia Onsite Concrete. This approach ensured a consistent and reliable concrete supply, reducing dependency on external logistics and maintaining programme certainty. Careful planning and coordination were required to manage large concrete volumes, sequencing of works, and integration of drainage and structural elements. The use of on-site production enabled flexibility in delivery, ensuring quality control was maintained throughout the construction process.
The project was completed within the required timeframe, demonstrating efficient delivery and strong collaboration across the project team. The completed works provide a robust, durable pavement and drainage solution capable of supporting long-term operational demands. The successful implementation of on-site batching and controlled construction methods ensured high-quality outcomes, improved programme reliability, and contributed to the overall success of this critical infrastructure scheme.
Gill Civil delivered infrastructure and public realm works for the Dukesfield Active Transport Link, improving pedestrian and cycling connectivity around Runcorn Railway Station while maintaining safe access through a constrained urban environment.
Gill Civil delivered AGL pavement core stabilisation works across MAG airports, using rapid-strength concrete and controlled on-site mixing to return critical aircraft wheel-path areas to service within restricted operational windows.
Gill Civil delivered time-critical pavement and drainage upgrades at Newquay Airport for the G7 Summit, working around the clock through COVID-19 supply disruption to maintain programme certainty in a live airside environment.
Simply complete the form and one of our specialists will get back to you as soon as possible to provide the support you need.
Fill in the form below with your details and queries. A member of our team will reach out to you as soon as possible to discuss your inquiry.