PART OF THE GILL GROUP
M25 Motorway
Gill Civil delivered drainage improvement works on the M25 between Junctions 22 and 23, upgrading existing gully infrastructure to increase surface water capacity and enhance motorway resilience during heavy rainfall.
Surrey County Council
Gill Civil delivered a programme of full-depth concrete road reinstatement works across Surrey, reconstructing carriageways to modern highway standards using high-durability concrete, enhanced reinforcement, and upgraded drainage to extend asset life while minimising disruption to road users and local communities.
A55
Gill Civil completed full-depth pavement replacements and crack repairs on the A55 between Junctions 34–35 within a single weekend possession, delivering 31 bay renewals using rapid-strength concrete and efficient sequencing to reopen the carriageway ahead of schedule and restore long-term performance with minimal disruption.
M54 Motorway
GCEL were appointed to carry out 2862m2 of full depth concrete repair on both carriageways of the M54 between junction 3 to 5. The scope of work includes the removal of existing dowelled concrete bays and reinstating using PQX (Rapid Strength Gain Concrete) overnight.