Project Overview & Scope
Gill Civil was appointed by Costain Ltd and Amey to undertake 2,862m² of full-depth concrete repairs on both carriageways of the M54 between Junctions 3 and 5. The works involved the replacement of 280mm thick dowelled concrete bays using PQ-X rapid-strength concrete, restoring pavement performance across this key motorway section.
Challenges and Execution
All works were carried out during night-time closures between 22:30 and 05:00, requiring efficient delivery to ensure carriageways were reopened to traffic by 06:00 each morning. Existing concrete bays were saw cut into manageable sections and removed using vacuum lifting equipment, with underlying formation inspected and replaced where required. New dowel bars were installed using specialist drilling equipment, followed by reinforcement placement and reinstatement using volumetrically mixed PQ-X concrete. Heated blankets were utilised to accelerate curing, enabling between 3–5 bays to be repaired during weekday shifts and up to 24 bays over weekend possessions.
Benefits and Outcomes
The works were delivered safely and efficiently, maintaining strict programme requirements and ensuring daily reopening of both carriageways without disruption. The use of rapid-strength concrete and controlled construction methods enabled high-quality reinstatement, improving pavement durability and extending the service life of the motorway.
OTHER PROJECTS
Partner with gill civil on your next project
Simply complete the form and one of our specialists will get back to you as soon as possible to provide the support you need.
Plan your Route
Enquire Now
Fill in the form below with your details and queries. A member of our team will reach out to you as soon as possible to discuss your inquiry.