Gill Civil delivered infrastructure and public realm works for the Dukesfield Active Transport Link, improving pedestrian and cycling connectivity around Runcorn Railway Station while maintaining safe access through a constrained urban environment.
Gill Civil delivered AGL pavement core stabilisation works across MAG airports, using rapid-strength concrete and controlled on-site mixing to return critical aircraft wheel-path areas to service within restricted operational windows.
Gill Civil delivered time-critical pavement and drainage upgrades at Newquay Airport for the G7 Summit, working around the clock through COVID-19 supply disruption to maintain programme certainty in a live airside environment.
Gill Civil delivered full-depth replacement of 25 deteriorated concrete bays on the A30 Long Rock Bypass, using high early-strength concrete during night closures to extend pavement life and minimise disruption. A30 Long Rock Bypass
Gill Civil delivered a 900mm-thick reinforced concrete protection slab over live fuel pipelines on the A556, providing a cost-effective alternative to diversion while maintaining full infrastructure protection and avoiding service disruption.
Gill Civil delivered approximately 4,000m² of full-depth concrete bay replacement on the M5 near Junction 27 at Willand, extending pavement life while maintaining programme delivery within a live motorway environment.
Gill Civil delivered replacement of 32 concrete bays on the A11 between Red Lodge and Barton Mills, using high early-strength PQX concrete during overnight closures to extend pavement life beyond 15 years.
Gill Civil delivered reinforced concrete pavement reconstruction at Birmingham Intermodal Freight Terminal, installing 390mm heavily reinforced slabs in phased works to improve load capacity while maintaining continuous access for live freight operations.
Gill Civil delivered approximately 55,000m² of PQC and over 1,000lm of drainage across key airside areas at Farnborough Airport, completing the works two months ahead of schedule while maintaining live operations.
Gill Civil delivered two new remote aircraft stands at Leeds Bradford Airport, including taxiway tie-ins, PQC pavement, drainage and AGL ducting, increasing stand capacity while maintaining uninterrupted live-airfield operations.
Gill Civil delivered urgent pavement reconstruction works across 19 high-risk areas of Manchester Airport’s Alpha Bravo Taxiway, completing the works within restricted night and weekend possessions while maintaining safe airfield operations.
Gill Civil delivered pavement and drainage renewal across Taxiway Echo and Stand 70 at Manchester Airport, reconstructing defective pavement and installing new drainage during restricted possessions while maintaining live airside operations.
Gill Civil delivered pavement renewal works at Manchester Airport’s Taxiway November Alpha and Stand 112, replacing deteriorated concrete and strengthening critical airside assets while maintaining safe operations within a live airfield environment.
Gill Civil delivered deep pavement reconstruction up to 800mm across Stands 27 and 63 at Manchester Airport, using fast-setting concrete and controlled pours to return both areas to operation within programme.
Gill Civil delivered pavement rehabilitation and infrastructure upgrades across Taxiway JE-JF and five stands at Manchester Airport, supporting Code C operations while maintaining access throughout complex live-airside works.
Gill Civil delivered full-depth reconstruction of 1,153m² of Manchester Airport’s Juliet Echo taxiway stands, overcoming soft subgrade and restricted airside access while maintaining quality and programme delivery within a live operational environment.
Gill Civil delivered full-depth reconstruction of 652m² of Manchester Airport’s Juliet 3 Taxiway, using onsite batching and UKAS-accredited testing to restore long-term pavement performance within a live airfield environment.
Gill Civil delivered full-depth rehabilitation of 29 damaged bays on Manchester Airport’s Echo 9 Taxiway, using onsite-batched concrete during restricted night possessions and completing the expanded works one shift ahead of schedule.
Gill Civil rehabilitated Taxiway Quebec at East Midlands Airport, delivering upgraded pavement and drainage within a live airside environment while maintaining safe, uninterrupted operations.
Gill Civil reconfigured a central airport apron in phased works, delivering upgraded pavement and lighting infrastructure within a live airside environment without operational disruption.
Gill Civil constructed a 4,500m² aircraft stand at Edinburgh Airport, delivering high-strength pavement and drainage on programme within a live winter airside environment.
Gill Civil constructed a new taxiway link at Gatwick Airport, delivering high-performance pavement and drainage works within a live airside environment while maintaining uninterrupted operations and meeting programme deadlines.
Gill Civil constructed a 12,500m² aircraft apron at Gatwick Airport, completing the works ahead of schedule while delivering a high-strength, durable surface for long-term operations.
Gill Civil rehabilitated Taxiway Juliet at Manchester Airport within restricted night operations, completing the works ahead of schedule while enhancing pavement strength and maintaining full airfield functionality.
Gill Civil delivered airfield pavement and drainage works at RAF Valley within a four-week shutdown, ensuring durable, high-performance infrastructure and on-time return to operations.
Gill Civil delivered drainage upgrades on the M25, installing higher-capacity gully systems within restricted night works to improve resilience and reduce flood risk.
Gill Civil delivered over 220,000m² of high-strength CRCP for dock and RoRo infrastructure, ensuring durable, large-scale performance through efficient on-site production and coordinated delivery.
Gill Civil has delivered ongoing CRCP repairs on the A417/419 for over a decade, providing efficient, rapid-strength solutions that maintain pavement performance with minimal disruption.
Gill Civil delivered 6,500m² of high-precision CRCP for a Bristol guided busway, completing the works on programme despite challenging conditions to ensure durable, long-term performance.
Gill Civil delivered taxiway rehabilitation at Manchester Airport, installing high-strength layered concrete within a live airside environment to enhance long-term pavement performance.
Gill Civil delivered full-depth concrete repairs on the M54 using rapid-strength solutions, ensuring safe overnight execution, daily reopening, and improved long-term pavement performance.
Gill Civil delivered 16,000m² of reinforced concrete pavement and drainage for the M5 Junction 23 Park & Ride, ensuring durable infrastructure through efficient on-site batching and coordinated delivery.
Gill Civil delivered a complex taxiway replacement at Gatwick Airport, protecting live services while enhancing long-term pavement durability within a live airside environment.
Gill Civil reinstated defective concrete slabs at Birmingham Airport using rapid-strength concrete, enabling safe, on-programme delivery and quick return to service within a live airside environment.
Gill Civil delivered over 135,000m² of pavement rehabilitation at Felixstowe Port, completing the works six months early while enhancing durability within a live operational environment.
Gill Civil delivered 22,500m² of reinforced concrete yard slabs for the DHL hub in Slough, ensuring durable, high-performance infrastructure through efficient coordination in a complex winter build.
Gill Civil delivered full-depth concrete road reinstatement across Surrey, enhancing durability and modernising the network while maintaining safe, efficient delivery with minimal disruption.
Gill Civil delivered phased concrete bay replacements on the M54 using rapid-strength solutions, completing the works ahead of schedule while minimising disruption and restoring long-term pavement performance.
Gill Civil is delivering reinforced concrete pavement works at Walney Airfield within a live environment, ensuring safe execution and high-quality, durable performance.
Gill Civil completed full-depth concrete repairs on the A55 within a single weekend possession, reopening the carriageway early while restoring long-term pavement performance.
Gill Civil delivered 18,000m² of reinforced concrete yard slabs at DIRFT III Lorry Park, completing the works ahead of programme while ensuring durability and efficient delivery within a busy multi-contractor environment.
Gill Civil delivered large-scale PQC, lean mix, drainage, and ducting works as part of the Manchester Airport Transformation Project, completing the scheme safely and on programme within a live 24-hour airside environment while enhancing apron capacity and long-term performance.
Gill Civil delivered major airside ducting, drainage, and high-strength pavement works at Manchester Airport within live night operations, ensuring safe delivery and long-term airfield performance.
Gill Civil delivered landside pavement and drainage infrastructure for Pier 2 at Manchester Airport, safely and on programme within a live environment, enhancing long-term performance and operational efficiency.
Gill Civil delivered airside pavement and drainage works on Taxiway Zulu at Manchester Airport, safely and on schedule, enhancing durability and performance.
Gill Civil delivered 18,000m² of reinforced concrete yard slabs at DIRFT III Lorry Park, completing the works ahead of programme while ensuring durability and efficient delivery within a busy multi-contractor environment.